Review · Industry software
Asta Powerproject review
Construction planning software from Elecosoft with critical path, risk analysis and resource and cost loading drawn directly on the Gantt chart.
By the TopToolAdvisor research desk · Updated November 10, 2026
- Features (35%)
- 9.2
- Ease of use (35%)
- 8.2
- Value (30%)
- 7.6
Asta Powerproject is the most construction-focused planner on this list. Elecosoft describes it as project management and risk analysis software for construction, infrastructure and related industries, and the core workflow happens on the Gantt chart: you draw and link tasks for critical path analysis and assign codes, calendars, resources and costs without leaving the chart. Task pools and code libraries help a planner build a programme quickly, and stakeholders can open plans in the free ProjectViewer without buying a licence. Licensing is flexible, with single licences tied to one user and device or concurrent licences shared across a team, and the SaaS edition brings it to Mac. Related products add a web portal (Asta Vision), site progress updates (Asta SiteProgress) and 4D. The main drawbacks are the lack of a published US price, a Windows-first desktop product and a mobile app that costs extra.
Who it is for
Contractors and planners who want a scheduler built for construction and infrastructure rather than general project work.
Price
See vendor pricing (USD check pending).
US price check pending. See the vendor pricing page.
Key features
- Draw and link tasks for critical path analysis inside the Gantt chart
- Task pools and code libraries to build plans quickly
- Codes, calendars, resources and costs assigned from the chart
- Single or concurrent licences, with a SaaS edition that runs on Mac
- Free ProjectViewer so stakeholders can open plans without a licence
Strengths and weaknesses
- Strength: Built for construction and infrastructure planning
- Strength: Free viewer for clients and subcontractors
- Strength: Concurrent licences lower the cost per user for shared teams
- Weakness: No published US price
- Weakness: Desktop edition runs on Windows; Mac needs the SaaS edition
- Weakness: Mobile companion app is licensed separately
Key facts
- Free trial: 14 days
- Platforms: Windows download; Mac through Asta Powerproject SaaS; separately licensed iOS and Android companion app
- Licensing: Single licence per user and device, or concurrent licence shared across devices
- Languages: English (Australia, UK, US) plus 11 other languages
Where it ranks
Asta Powerproject is No. 2 in our Best Construction Scheduling Software verdict.
Alternatives we scored
- Microsoft Project8.6
- Smartsheet8.3
- TeamGantt8.2
- Outbuild8.1
Visit elecosoft.com · Questions or corrections: editorial@toptooladvisor.com